Short version. The full edition of this factory (14 September 2026), with history, geography, practical examples and annotated sources, is available in Russian. Full edition (Russian)
In simple terms
Electricity, heat, water, sewerage, communications and fuel form one connected system: one failed node can stop a hospital, homes or production. The factory shows the dependencies, the critical services, and which measures really reduce interruption time and at what cost. It does not replace the grid operator, design engineer or emergency services.
Who it helps
Residents and communities, companies, utility managers, municipalities, regions, government bodies, universities and NGOs.
Questions you can bring
- What must be protected before winter?
- Why does the water supply depend on a single substation?
- Does the school need a backup power source?
What you receive
- a dependency map and three scenarios: ordinary fault, weather event, cascade failure
- a passport of critical services
- a register of measures with priorities
- a recovery plan with owners of actions
How quality is checked
Every number has a source, date, unit and owner, and scenarios are reproducible. Standards, tariffs and backup schemes are never transferred between jurisdictions without local verification.
Three example requests
Village
“The medical post and the water pump lose power during storms.”
City
“A water outage stops our production.”
Region or country
“How do we compare measures before winter?”
Sources cited in the full edition
Status: an approved direction of development. These pages describe capabilities; they do not state that a permanent service is already operating or promise funding, partnerships or results.